The Tommy Boy GTX Restoration Blog
All
- All
- Uncategorized
Planning out exhaust system
Part of the entire process and final result will be having the perfectly tuned exhaust...
Install Positive Battery Cable Harness
Getting all the wiring and electrical ready for testing in the car we had to...
Defroster Vents
Installing all the new hardware so we have clean and useable defroster vents now in...
Glovebox door and hinges
The dash area now looks completely different with the glove box door installed and functional...
Stereo install
Installation of the original 1967 AM radio that we had converted to an AM/FM/Bluetooth capable...
Transmission dipstick
The original transmission dipstick tube was so bent and damaged it would have caused leaks...
Transmission lines finished
After some careful bending and some changes made to the transmission lines everything fits as...
Routing transmission lines
Working on the transmission lines to get everything to fit correctly and also not be...
Callahan hoses
Making custom stamped heater hoses and radiator hoses from our favorite "sponsor"....Callahan Auto Parts -...
Inner fender splash shields
Installing the inner fender shields now that they are all painted and in good condition....
Washer system
Installing the windshield washer system with the original style Chrysler washer fluid tank, motor, nozzles...
Instrument cluster testing
Testing all the lighting and connections on the instrument cluster before installation. The biggest difference...
Seat frames finished
Seat frames are all finished up now and powder coated black and repaired. Also the...
Antenna cable routing
In an interesting find, it appears that our car here never originally came with a...